Reviving Praderas (Day 25) — Tier A closed and two parallel tracks
Today we pushed faster than the usual cadence: finish Tier A (Days 10–16), ship Phase 6 v1.2 with a public page for tools, and publish the Tuqan milestone aligned with application repo PR #44.
Wall clock (order of magnitude)
- Retrofit Days 10–16 (7 pairs, Comfy + WebP): ~3.5–4 h (batch script
scripts/comfyui/batch_tier_a_10_16.sh). - Phase 6 v1.2 (
/for-ai-agentsES/EN): ~30 min. - Tuqan ES/EN article: ~25 min.
- This log + Day 25 / Tuqan covers: same session.
Block A — Tier A: rows 10–16 → done
| Order | Translation_Key |
WebP (seed) | ~KiB |
|---|---|---|---|
| 10 | praderas-day-10-batch-2-multilingual-hubs |
day10-…-batch2-multilingual-hubs-hero.webp (10052026) |
~102 |
| 11 | praderas-day-11-batch-3-security-ui |
day11-…-batch3-security-privacy-ui-hero.webp (11052026) |
~114 |
| 12 | praderas-day-12-batch-4-archive-blog-log |
day12-…-batch4-ai-archive-blog-hero.webp (12052026) |
~111 |
| 13 | praderas-day-13-batch-5-productivity-log |
day13-…-batch5-productivity-tools-hero.webp (13052026) |
~60 |
| 14 | praderas-day-14-batch-6-7-8-translation-finale-log |
day14-…-batch678-translation-finale-hero.webp (14052026) |
~106 |
| 15 | praderas-day-15-ui-search-footer-log |
day15-…-day15-search-footer-ui-hero.webp (15052026) |
~56 |
| 16 | praderas-day-16-sitemap-robots-lang-log |
day16-…-day16-sitemap-robots-lang-hero.webp (16052026) |
~69 |
Pace decision: instead of ~2 pairs/day, we closed seven so Reviving Praderas Days 1–16 no longer use Picsum heroes. The batch script cuts friction; frontmatter_audit.py still gates merge.
Status: .agents/retrofit-cover-queue.md — Tier A complete. Next retrofits: tiers B+ per comfyui-cover-images.md.
Block B — Phase 6 v1.2: /for-ai-agents
Public pages (ES /for-ai-agents, EN /en/for-ai-agents, Translation_Key: praderas-for-ai-agents) summarising:
- JSON 1.1 endpoints (
/blog.json, search, RAG fields). - Language and canonical tag rules.
- Links to
.agents/blog-json-api.md.
Why HTML, not only .agents/ in git: production tools do not read the repository; they need a stable URL on blog.praderas.org.
Block C — Tuqan (parallel)
New chapter in Tuqan Modernization (Series_Order: 2): PHP 8 plan, Docker-only dev, PHPUnit in containers, and the eight-stage roadmap after PR #44. The post links the repo; checklists live in Tuqan, not here.
What’s next
- Tuqan Stage 1 — Docker foundation in the application repo.
- Retrofit Tier B — series openers and long tail (~2 pairs/day or batches).
- Phase 6 extras — tag filters on JSON, static pre-generation (backlog).