Reviving Praderas (Day 12) — transparency on the merge and this log pair
This post documents changes already on main from the earlier merge: translation batch 4 (AI), an English date archive, and paired blog listing pages so the language switcher appears on /en/blog. What that merge did not include was this daily log pair (ES + EN); we add it now in a small PR from up-to-date main, matching the project’s “one transparent day note” convention.
Wall clock (this log-only PR)
- Session start (agreed reference stamp):
2026-05-03 11:56:12 CEST - Immediately before commit + push of this PR (reference):
2026-05-03 12:16:46 CEST
The useful comparison is ~20 minutes of wall clock between those stamps (steering, ES/EN log, tracker, branch/PR, and this timestamp correction) versus the manual order-of-magnitude in the table below. The heavy translation and template work shipped in the previous merge; this PR closes the narrative gap.
What the merged PR already contained (executive summary)
- Batch 4 (AI core) — Six ES/EN pairs (
praderas-b4-ai-games-evolution,…-early-disease-detection,…-medicine,…-society-impact,…-entertainment,…-neural-nets): games, early detection, medicine, society, entertainment, neural networks. Translation_Key: praderas-nav-blog-listingoncontent/blog.mdandcontent/en/blog.md— enablesalternate_language_pagesolang-switcher.twigcan show Español from/en/blog./en/archivopaired witharchivo.md(praderas-nav-archive) and a bilingualarchive.twig(month labels, breadcrumbs, language-scoped post lists).sidebar.twig— archive widget links to/en/archivowhencontent_langis English..agents— tracker and backlog already reflected batch 4 and EN routes.
Why a separate PR for the log
- Do not rewrite merged history — Code and AI posts were already reviewed; the clean fix is to add the public explanation layer.
- Honesty with readers — the Reviving Praderas series assumes a dated engineering note with rationale and time framing; skipping it left a visible gap after Day 11.
Senior “by hand” order-of-magnitude (this log PR only)
| Workstream | Indicative range |
|---|---|
ES/EN log pair + Translation_Key + Series_Order |
1–2 h |
| Tracker / changelog edits | 20–40 min |
Branch from main, PR hygiene |
20–40 min |
| Total | ~2–3.5 h |
With an assistant plus a clear owner brief, the elapsed wall time between the two timestamps above landed around twenty minutes (including correcting the published clocks and pushing); the senior band still describes editorial work without an assistant—not the earlier merged code batch.